Overview
High Efficiency 90m³/h Trailer Pump for Heavy Construction Projects
Looking for a powerful, reliable, and fuel-efficient concrete pumping solution for large-scale construction projects? The DHB90-16-199 Diesel Concrete Pump is engineered for maximum performance in demanding environments where stable power supply is unavailable. With a theoretical output of 90 m³/h and a high pumping pressure of 16 MPa, this model is designed to deliver consistent concrete flow for high-rise buildings, bridges, tunnels, highways, and remote infrastructure projects.
Built with a heavy-duty diesel engine system and advanced hydraulic technology, the DHB90-16-199 ensures continuous operation, reduced downtime, and superior pumping stability even under harsh site conditions.
Why Choose Us
The DHB90 series delivers up to 90 cubic meters of concrete per hour, making it ideal for large-scale commercial and infrastructure projects requiring fast and continuous concrete placement.
Equipped with a 199KW industrial-grade diesel engine, this pump ensures stable power output without reliance on external electricity—perfect for remote job sites.
Strong pressure capacity allows long-distance and vertical concrete delivery, suitable for high-rise buildings and deep foundation work.
The S-tube valve design ensures smooth concrete flow, reduced blockage risk, and extended service life under heavy-duty usage.
Designed for Africa, Southeast Asia, Middle East, and South America construction conditions where power instability and rough terrain are common.
Equipped with world-class hydraulic components for stable operation, high efficiency, and lower maintenance costs.
Components
A concrete mixer pump is composed of several key systems that work together to ensure efficient mixing, pumping, and continuous concrete delivery on construction sites.

Mixing System
Includes the mixing drum, blades, and feeding hopper. It ensures raw materials are evenly mixed into high-quality concrete.
Pumping System
Consists of the main pumping cylinder, S-valve, and delivery pipeline, responsible for pushing concrete to the required location smoothly and continuously.
Hydraulic System
Provides stable power for both mixing and pumping operations, ensuring reliable performance under heavy load conditions.
Power System
Can be equipped with a diesel engine or electric motor, depending on project requirements and site conditions.
Control System
A user-friendly control panel that allows operators to easily manage mixing, pumping, and pressure adjustments.
Lubrication System
Automatically lubricates key components to reduce wear, extend machine lifespan, and maintain stable operation.
Chassis & Frame
Heavy-duty steel structure designed for mobility, stability, and durability during transportation and operation.
Applications
The DHB90-16-199 Diesel Concrete Pump is widely used in:
- High-rise residential and commercial buildings
- Highway and bridge construction
- Tunnel and metro projects
- Hydropower and dam engineering
- Rural infrastructure development
- Remote construction sites without electricity supply
Technical Specification
| Item | Unit | Specification |
|---|---|---|
| Max. Theoretical Concrete Output | m³/h | 90 |
| Max. Concrete Pumping Pressure | MPa | 16 |
| Max. Pumping Frequency | times/min | 25 / 15 |
| Distribution Valve Type | – | S-Tube Valve |
| Hydraulic Pump | – | Kawasaki K5V140DT |
| Main Electric Components | – | LS / Omron / Siemens |
| Concrete Cylinder Diameter × Stroke | mm | Φ200 |
| Oil Cylinder Specification | mm | Φ140 × 1800 (Xieli hydraulic cylinder) |
| Outlet Diameter | mm | Φ180 |
| Loading Height | mm | 1400 |
| Diesel Engine Power | kW | 199 |
| Rated Speed | r/min | 2200 |
| Hydraulic Circuit Type | – | Open circuit system |
| Main Hydraulic System Pressure | MPa | 32 |
| Mixing System Pressure | MPa | 12 |
| Max. Mixing Speed | r/min | 40 |
| Hydraulic Oil Tank Capacity | L | 800 |
| Max. Aggregate Diameter | mm | 40 |
| Delivery Pipe Inner Diameter | mm | Φ125 |
| Dimensions (L × W × H) | mm | 6500 × 2200 × 2300 |
| Total Weight | kg | 6500 |
| Drag Speed | km/h | ≤ 8 |
Diesel VS Electric Trailer Pump
| Feature | Diesel Trailer Pump | Electric Trailer Pump |
|---|---|---|
| Power Source | Diesel engine (independent operation) | Electric motor (requires stable power supply) |
| Working Environment | Suitable for remote areas, no electricity sites | Best for urban or construction sites with power |
| Mobility | High flexibility, can work anywhere | Limited by power access |
| Operating Cost | Higher fuel cost | Lower electricity cost |
| Maintenance | Requires engine + hydraulic maintenance | Lower maintenance, simpler structure |
| Performance Stability | Stable even in harsh environments | Very stable when power supply is stable |
| Application | Roads, rural projects, bridges, remote construction | Urban housing, factories, infrastructure with power |
| Start-up Requirement | Independent diesel start | Requires external electricity connection |
| Best Choice For | Outdoor + remote + unstable power areas | Stable construction sites with grid power |
Our Service
Pre-Sales Service
- Professional consultation to help you choose the right model
- Customized solutions based on project requirements (capacity, pumping distance, site conditions)
- Detailed technical specifications, drawings, and quotations
- Video inspection and factory introduction before purchase
- Fast response within 24 hours for all inquiries
After-Sales Service
- Regular follow-up to ensure stable machine performance and customer satisfaction
- Installation guidance and operation training (online or on-site support available)
- Supply of original spare parts for long-term operation
- Technical support for troubleshooting and maintenance
- One-year warranty with lifelong technical assistance
Project Cases
Kenya – Infrastructure Development Project
Applied in urban and rural road works, providing stable long-distance concrete delivery under challenging terrain and climate conditions.
Philippines – High-Rise Residential Project
Delivered consistent high-pressure pumping for multi-storey buildings, improving construction speed and reducing labor costs.
FAQ
Use the right mix, clean the pipeline after each job, and maintain the valve and hydraulic system.
Output, pressure, engine power, delivery distance, and maximum aggregate size.
Yes. The system is designed for easy control, requiring only 2–3 operators.
The delivery time is usually 15–30 working days after receiving the deposit, depending on the model, configuration, and order quantity. For urgent orders, we can also arrange priority production to shorten the lead time.

